OKW Enclosures - Roof & Cladding Replacement
UCL were approached by OKW Enclosures to tender for their Roof and Cladding Replacement project. After a detailed and comprehensive tender submission was sent, we were awarded the project. The works included removal and disposal of the existing roof sheets and wall cladding, replacement of all abutment flashings, gutter linings, parapet wall sheeting, cap flashings and weatherproofing details. We also replaced all corner, jamb and window flashings to the building along with new internal flashings to the underside of the guttering.
Associated British Ports - Line Markings
We were the appointed contractor to carry out a refresh of the road markings at Associated British Ports in Southampton. The works involved hydro-blasting the redundant markings and applying new thermoplastic markings to the newly marked out areas.
Swan Centre - External Decoration
UCL were tasked with carrying out high-level exterior painting above the car park entrance at the Swan Centre in Eastleigh. We cleaned down all the areas to be painted and applied a blue and white masonry paint to prolong the paint covering as long as possible.
All Saints Academy - Internal Refurbishment Works
UCL were the successful tenderer to carry out some internal refurbishment works at All Saints Academy. The works included the replacement of ceiling files, removal and reinstallation of smoke heads and upgrade of the existing lighting to LED.
Whilst on site, we also installed a new MF Ceiling to some toilets in their Music Block and constructed a new stud wall with acoustic insulation and fire-rated double door sets.
The project was delivered on time and on budget.
Whilst on site, we also installed a new MF Ceiling to some toilets in their Music Block and constructed a new stud wall with acoustic insulation and fire-rated double door sets.
The project was delivered on time and on budget.
Nigel Bowes Academy - Female Washroom Conversion
UCL were contracted to divide a room in two to form two ladies toilets. We partly demolished a clockwork wall to form a second opening to the room. The works involved installation of support lintels, construction of timber framed double boarded stud walls, hygienic wall cladding, new plasterboard ceiling, a self-contained cubicle in each of the newly formed rooms (including toilet, semi-recessed vanity unit and wash-hand basin with non-concussive taps.
We also installed new flooring throughout along with reconfiguring the lighting circuits to suit.
The project was carried out on time and on budget.
We also installed new flooring throughout along with reconfiguring the lighting circuits to suit.
The project was carried out on time and on budget.
Royal Southampton Yacht Club - Building Refurbishment
UCL were the appointed contractor to carry out some major refurbishment works for Royal Southampton Yacht Club. These works were following a major salt-water flood earlier in the year.
The works involved a Ladies, Gents and DDA toilet and shower refurbishment, replacing all vanity units, cubicles, toilet pans and radiators.
We also replaced all doors, skirtings and flooring throughout along with a full redecoration.
The works involved a Ladies, Gents and DDA toilet and shower refurbishment, replacing all vanity units, cubicles, toilet pans and radiators.
We also replaced all doors, skirtings and flooring throughout along with a full redecoration.
South Oxfordshire District Council - Vanity Units
UCL were contracted to manufacture and install bespoke vanity units with low level worktops to enable access for wheelchair users. The vanity units were formed from solid grade laminate material. UCL also installed lift off access panels along with illuminated storage bins and GHD professional hair dryers.
UCL completed the project on time and on budget.
UCL completed the project on time and on budget.
ACS Cobham International Schools - Internal Alterations
UCL were awarded an internal alterations contract in the summer of 2023. Some of the works included forming new openings within walls, construction of a new timber framed ceiling, glazing replacements, kitchen refurbishments, replacement floor finishes throughout and redecoration.
The project was carried out on time and to our clients budget.
The project was carried out on time and to our clients budget.
Theatre Refurbishment for a Film Studios in Iver Heath
We were the successful contractor to carry out a large refurbishment project at a Film Studios in Iver Heath.
The project involved stripping out all existing lighting and power, installation of new underfloor heating, full electrical works to the theatre, new lighting, new air conditioning, new flooring and re-decoration throughout.
The project was carried out on time and on budget.
The project involved stripping out all existing lighting and power, installation of new underfloor heating, full electrical works to the theatre, new lighting, new air conditioning, new flooring and re-decoration throughout.
The project was carried out on time and on budget.
Foray Ford - Handrail Installation
UCL were asked to install a new handrail system with safety glass. The handrail had a stainless steel finish which was then powder coated white. 10mm safety glass was then installed with four holes for fittings.
The project was delivered on time and our client was pleased with the results.
The project was delivered on time and our client was pleased with the results.